  1. A

    Hi all, just wondering if anyone knows how to change the 0 / ground floor reference level?

    I want to move the reference without moving all the elements, and for a new level to be set as 0.000

  2. T

    Hopefully this PR adds this functionality

    Video here.

  3. M

    That's called lying ;)

    But in all seriousness, what's the usecase for this? There is a proposed fix https://github.com/IfcOpenShell/IfcOpenShell/pull/2451 which is not quite right as the ElevationOfRefHeight is a bit of a weird attribute with quirks of its own. I think it makes more sense to have an option where it is annotated with any custom arbitrary text, which if you wanted you can type in RL +0.000m if you wanted to. E.g. right now if you type in a description in the annotation.

  4. T
  5. M

    Right, so I guess there are two possible elevations, the local engineering coordinate elevation (e.g. arbitrary Z value of your modeling software) or the true orthogonal height in the coordinate reference system (e.g. Australian Height Datum), in which case it should be Z + OrthogonalHeight in the MapConversion (which is the more correct way to supersede ElevationOfRefHeight). Is that perhaps the way to go? Does that solve your original problem @Ace?

  6. T

    should be Z + OrthogonalHeight in the MapConversion (which is the more correct way to supersede ElevationOfRefHeight). Is that perhaps the way to go?

    Yeah, i could do that instead.

    ...

    I wonder where ElevationOfFFLRelative/ElevationOfSSLRelative will come into play with these section level annotations, in the future?

  7. M

    Yeah in the future you'd be able to tag either FFL or SSL, and naturally the RL annotation line will adjust to one of those levels, whereas right now the RL annotation line is stuck to the IfcBuildingStorey's Z location.

  8. A

    @Moult said:

    That's called lying ;)

    But in all seriousness, what's the usecase for this? There is a proposed fix https://github.com/IfcOpenShell/IfcOpenShell/pull/2451 which is not quite right as the ElevationOfRefHeight is a bit of a weird attribute with quirks of its own. I think it makes more sense to have an option where it is annotated with any custom arbitrary text, which if you wanted you can type in RL +0.000m if you wanted to. E.g. right now if you type in a description in the annotation.

    In truth I've worked on multiple projects where the 0 datum changes because of some reason (before we hit site), most of the time it technically works better from a different spot or it's a 'political' decision, the other factor is when people just use the wrong datum to start the project when there is a split level, so I think it would be nice if it could be adjusted :)

  9. A

    @theoryshaw said:

    Hopefully this PR adds this functionality

    Video here.

    This is perfect @theoryshaw

  10. M

    @Ace yeah, looking to the future we can aim to do better. One of the reasons people fake this is because it's hard to change in existing software. But if our software makes it easy (e.g. moving a level is easy, and also doing the OffsetObjectPlacements patch is easy) then hopefully we can push to more correct modeling.

    However if the usecase is offsetting due to known map coordinates orthogonal height, that should be supported. I'll find some time to go through @theoryshaw's PR.

  11. A

    @Moult said:

    Right, so I guess there are two possible elevations, the local engineering coordinate elevation (e.g. arbitrary Z value of your modeling software) or the true orthogonal height in the coordinate reference system (e.g. Australian Height Datum), in which case it should be Z + OrthogonalHeight in the MapConversion (which is the more correct way to supersede ElevationOfRefHeight). Is that perhaps the way to go? Does that solve your original problem @Ace?

    I think so?

    The height from Sea level is absolute, the project itself isn't shifting up or down, I just want to change the project 0 datum so that when they start building it is from where the new 0 position is agreed