  1. F

    I am trying to get my head around the whole IFC spatial structure hierarchy and apply it to a real world application, and more specifically for the new IFC4.3. Moving forward, I would suspect if clients are requesting IFC deliverables, as part of their responsibility or a BIM Consultant that represents their interests needs to provide the project spatial structure breakdown. I would also suggest these needs to be done as 1 of the initial conceptual design steps.

    Project Type: IfcBridge

    Project (IfcProject): Queensland TMR (Bridges)

    Site (IfcSite): North Coast, Wide Bay & Burnett

    Location (IfcFacility): Elizabeth Avenue Pedestrian Overpass

    Structure (IfcBridge): Proposed Steel Pedestrian Bridge

    Work Area / Level (IfcBridgePart): Western Access Ramp

    Work Zone (IfcSpace): North Frame

    I would be interested in the thoughts of others how spatial structure should be applied.

  2. W
  3. F

    I was thinking my Welded Assemblies would be where I should be using the IfcElementAssemblyType. Would that be right or is that 1 level too late?

  4. M

    It seems correct :)

  5. W

    I agree.

    Another option could be:

    Work Area / Level (IfcBridgePart): Western Access --> CompositionType = COMPLEX

    Lot 01 / Level (IfcBridgePart) : North Frame --> CompositionType = ELEMENT (aggregated in Work Area)

    But this may just be adding unnecessary complexity...